Installation Guide

From flat-packed to finished wall.

A complete step-by-step guide to installing MagPanel acoustic wall panels. Read it fully before you pick up a saw — a little preparation makes the difference between a clean result and a frustrating one.

Before you begin

Gather your tools and materials.

Read this section fully before picking up a saw. A little preparation makes the difference between a clean install and a frustrating one.

Tools

  • Tape measure
  • Pencil and spirit level
  • Fine-tooth handsaw or circular saw
  • Utility knife
  • Caulking gun
  • Drill (optional — for screw fixing)
  • Sanding block, fine grit
  • Safety glasses

Materials

  • MagPanel acoustic wall panels
  • Construction adhesive (Sika Fix+ or equivalent)
  • Wood screws 45 mm (optional — for stud fixing)
  • 2 mm spacers or cardboard strips
  • Timber trim or reveal strip (optional)
  • Touch-up paint or wood filler

Allow 48 hours. Panels must acclimatise flat in the room before installation — this prevents bowing and gap changes after fixing.

Step by step

The installation process.

Eight steps from flat-packed to finished wall. Work through them in order — skipping ahead is where mistakes happen.

Acclimatise the panels

Unbox the panels and lay them flat — stacked if needed — in the room where they will be installed. Leave them for a minimum of 48 hours. Timber expands and contracts with temperature and humidity, and skipping this step can cause bowing or gap changes after the panels are fixed to the wall.

Do not lean panels against a wall during acclimatisation — lay them flat to prevent warping.

Prepare the wall

The wall must be clean, dry, and reasonably flat. Remove loose paint, dust, or grease. Locate and mark stud positions with a pencil — you'll need these if you choose screw fixing. Check the wall is plumb with a spirit level; fill any significant low points before you start.

Do not install over freshly plastered or damp walls — allow a minimum of four weeks full drying time.

Plan your layout

Measure the wall and plan the full panel layout before cutting anything. Dry-fit panels against the wall and number them in sequence. Account for sockets, switches, or architectural features. Decide how you'll handle edges — raw, trimmed with reveal strip, or finished with colour-matched filler.

Start from the most visible corner and work outwards — any cut panel will land at the less prominent end of the wall.

Cut to size

Use a fine-tooth handsaw or circular saw with a fine-tooth blade. Always cut with the face (veneer side) up to prevent tear-out. For small notches around sockets, score with a sharp utility knife and snap cleanly. Lightly sand any cut edges with fine-grit paper before fixing.

Inspect every panel before you cut — once a panel is cut, it cannot be returned for a change of mind.

Apply adhesive

Load a caulking gun with construction adhesive — Sika Fix+, CT1, or a similar hybrid polymer adhesive. Apply in a continuous zigzag pattern across the back of the felt, keeping clear of the very edges. Do not use PVA, latex, or water-based adhesives.

Apply adhesive and wait 60 seconds before pressing to the wall — allowing it to become tacky gives a stronger initial bond.

Fix to the wall

Press the panel firmly against the wall, checking alignment with a spirit level as you go. Use 2 mm spacers or cardboard strips between panels to maintain a consistent expansion gap — never butt panels tightly together. Apply firm, even pressure for 30–60 seconds per panel. Work in sequence.

Screw a temporary support batten to the wall below the first row to hold panels level while the adhesive sets.

Secure with screws (optional)

For a more permanent fix — especially on ceilings or in high-humidity areas — supplement adhesive with 45 mm wood screws driven through the PET felt backing into wall studs. Pre-drill to avoid splitting. Use a countersink bit so the screw head sits flush with the felt surface.

Screw fixing is recommended for ceiling installation and for panels longer than 1200 mm.

Finish and enjoy

Remove spacers once the adhesive has set — typically 2–4 hours for initial set, 24 hours for full cure. Apply timber reveal strips or colour-matched filler to exposed edges if desired. Wipe down panel faces with a dry cloth. Allow 24 hours before hanging anything from or near the panels.

Sit in the room once complete — notice the difference. The acoustic change is most obvious the first time the space fills with sound again.

Important

Read before you cut.

A few things that cannot be undone — worth 60 seconds of your time before you start.

Inspect every panel before cutting

Once a panel has been cut, it cannot be returned for a change of mind. Check all panels for defects before you proceed.

Do not install on damp or freshly plastered walls

Allow a minimum of four weeks drying time for new plaster. Moisture trapped behind panels can cause adhesive failure and panel damage.

Do not use water-based adhesives

Use only solvent or hybrid polymer construction adhesive. PVA and water-based adhesives do not provide adequate bond strength for wall panels.

Always leave a 2 mm expansion gap between panels

Timber moves with humidity and temperature. The expansion gap prevents panels from buckling or cracking as the wood expands seasonally.

Start from the most visible corner

Work from the most prominent corner of the wall outwards. Any cut panel at the end of a run will fall at the less visible edge — where it matters least.

Allow 24 hours before hanging anything near the panels

Give the adhesive time to reach full cure before applying any lateral force or load. Most construction adhesives reach 80% strength within 24 hours at room temperature.

Still have questions before you start? We're happy to advise — contact us before you order and we'll make sure the panels suit your wall and application.